
Structural design of a new steel staircase connecting the basement and first floor in a Class A building in Lower Manhattan, followed by special inspections of the steel through construction.
The Ordering Force carried the staircase from design through inspection. Reviewing the shop drawings and then inspecting the installed steel meant the same engineer who set the design intent was verifying it in the field.

Design, shop drawing review and special inspections were completed in 2026.