Structural repair design for a four-landing fire escape on a Manhattan building, where corrosion had compromised stringers, beams and a footing at three locations.
Each repair was drawn as a step-by-step sequence: add new steel, remove the rusted section, splice, then replace the stringer. The new angle carries the load before the old steel is cut, so the fire escape is never left unsupported.
The design follows earlier repair shoring work by The Ordering Force at the same building.

Signed and sealed repair drawings were issued in October 2026.