
Facade repair design for a six-story building in the Bronx to address two DOB violations, based on the findings of an engineering report, followed by special inspections for the repair filing.
Clearing a violation requires more than a repair; the work has to be designed, filed and inspected so DOB can accept it. The Ordering Force handled the design and the inspections, keeping the scope matched to what the violations required.
Repair plans and special inspections were completed for Chestnut Holdings.